Layer by layer, by hand

Our Process

Layer by layer, by hand

Decora finishes are built in thin layers and finished by hand. This is what goes into a Microcement or lime plaster surface, from bare substrate to final seal.

Before you begin

Great finishes start below the surface

Most problems with decorative finishes trace back to preparation or the wrong primer. Every system we supply is specified for the substrate it is going over and the conditions it has to live in, so tell us both before you order.

Microcement

The Decora Diamond System

A complete Microcement system for floors, walls, showers and benchtops, applied over concrete, tile, marble and other sound substrates.

Shop Microcement

The Decora Diamond System
  1. 01

    Prepare the substrate

    The surface must be clean, dry, sound and flat. Loose or drummy tiles come up, grout lines are filled and levelled, and in any wet area a compliant waterproofing membrane is installed to AS 3740 before the system goes on.

  2. 02

    Prime

    One coat of Decora primer by brush or roller. DOC Primer is used on concrete, and One Primer on ceramic tile, marble and granite.

    Primer matched to the substrate
  3. 03

    Level & reinforce

    Uneven or irregular surfaces receive Decora Floor Level, with fibreglass mesh reinforcement where required, to create a stable, even base.

  4. 04

    First coat

    Diamond Floor is applied thin with a stainless steel trowel and shaved smooth.

    Touch dry in 2 to 3 hours at 20°C
  5. 05

    Final coat

    Once the first coat is dry, the final coat is trowelled on to create the movement and character of the finish, then smoothed with a stainless steel trowel.

  6. 06

    Seal

    When the surface is fully dry, two coats of Diamond Sealer are applied in matte or gloss. The sealer is what makes the surface water resistant and easy to care for.

    Matte or gloss
  7. 07

    Cure

    The surface is protected for at least 24 hours after sealing and reaches full hardness after 5 to 7 days. Allow a week before washing.

    Full hardness in 5 to 7 days

Venetian Plaster & lime

Genuine lime finishes

Slaked lime and lime powder plasters for walls and ceilings, applied in layers and finished by hand.

Shop Venetian Plaster

Genuine lime finishes
  1. 01

    Prepare

    Walls should be sound, clean and free of dust. Lime finishes are designed for walls and ceilings, not floors.

  2. 02

    Prime

    A breathable Decora Mineral Primer prepares most surfaces and gives the lime a consistent base to bond to.

  3. 03

    Base coats

    The first layers are laid down with a stainless steel trowel. Depending on the finish, a system takes one to three coats.

    1 to 3 coats, by finish
  4. 04

    Finish & burnish

    The final coat is worked and burnished by hand. This is where the depth and sheen are created, from soft matte to high gloss.

  5. 05

    Protect

    Sealing is not always needed. In wet, high traffic or exterior areas, Natural Wax, a Decora sealer or Nano Seal adds protection, and Metal Wax can add a metallic lustre.

    Allow 48 hours before cleaning

Timing

Days, not hours

A typical Microcement job takes three to four days in warm weather and up to a week when it is cool, because each layer needs time to dry before the next goes on. Rushing a coat is the fastest way to compromise a finish.

3 to 4 Days in warm weather
Up to 7 Days in cool weather
24 hrs Protection after sealing
Two days, hands on, in Caloundra

Learn the process

Two days, hands on, in Caloundra

Our installer training covers substrates, priming, trowelling, tinting and sealing on day one, then the Decora lime finishes, layering and burnishing on day two. Small groups, a certificate on completion and ongoing support after you leave.